Basic
Installation Instructions
Prepare
a footing and set a guide-line at the desired height of curb.
Lay block alongside footing. Pour concrete (4000 psi) into footing.
Set block in concrete even with guide-line, leaving a
joint between blocks.
Return and mortar the joints between blocks once concrete
sets properly.
|